Tape-out is the moment design data is released for manufacturing. Before that, sign-off checks argue the chip is ready — timing, power, and physical correctness.
Tape-out is a release decision after sign-off evidence — not a vibe.
Static Timing Analysis — prove timing without needing all vectors.
IR drop, peaks, leakage estimates — will the grid survive?
Design Rule Checks — geometry obeys foundry rules.
Layout vs Schematic — layout matches intended connectivity.
| Check | What it proves | Typical fail symptom |
|---|---|---|
| STA (setup) | Data arrives before capture edge | Negative setup slack on critical path |
| STA (hold) | Data stable after capture edge | Hold violation after CTS skew change |
| IR drop | Supply voltage within spec under load | Logic slows or fails at high activity |
| EM / thermal | Current density and heat OK | Long-term reliability risk |
| DRC | Geometry rules (width, spacing) | Shorts, opens at manufacturing |
| LVS | Layout netlist = schematic netlist | Missing via, wrong device count |
Even after tape-out, silicon bring-up can find surprises. Sign-off reduces risk — it does not grant magic immunity.
Ship decisions are not “zero bugs” — they are documented residual risk:
“We’ll fix it in software” without a ticket and owner — that is how recall programs start.
A hold violation found one week before tape-out may need a metal-only ECO — moving cells, inserting buffers, no RTL change if lucky. An RTL FSM bug found then may cost millions and months for mask respin. That is why Module 1 exists.
Pilots don’t skip the checklist because the last flight was fine. Sign-off is the checklist before you leave the runway toward the foundry.
RTL engineers often read STA report lines like this (simplified):
Path Group: clk_sys Startpoint: u_i2c/byte_fsm/state_reg[0] (rising edge-triggered FF) Endpoint: u_i2c/bit_engine/scl_oe_reg (rising edge-triggered FF) Clock: clk_sys (period 10.000ns) data arrival time ............ 8.420 ns required time ................ 9.500 ns slack (MET) .................. 1.080 ns # Negative slack = FAIL (must fix via RTL, constraints, or PD) # Your early RTL choices decide how hard this fight becomes
| ASIC sign-off | FPGA sign-off |
|---|---|
| STA, DRC, LVS, IR drop | Post-PAR timing report |
| Foundry GDSII handoff | Bitstream generation |
| ATE + scan at factory | Board functional test |
| ECO / respin costly | Reprogram in minutes |
FPGA “sign-off” looks like timing reports + successful bitstream + board bring-up. Different artifacts, same seriousness about timing and verification.
“What is tape-out?” — The release of final GDSII (layout) to the foundry for mask fabrication — after all sign-off checks pass or risks are accepted.
| Term | Meaning |
|---|---|
| GDSII | Final layout database sent to foundry |
| STA corner | SS/FF/typical — slow/fast silicon + temperature |
| Waiver | Documented exception to a rule |
| Shuttle | Shared mask run — cheaper prototype |