RTL Problems / Level 8 · Sequential Design
What You Will Learn
By solving 2-Way LRU Tracker, you will acquire core industry skills:
- Synthesizable hardware modeling in standard Verilog-2001 / SystemVerilog.
- Correct handling of interface port contracts, edge-triggered clocks, and active-low/high resets.
- Simulation waveform interpretation and debugging using timing diagrams (VCD traces).
- Architectural avoidance of timing violations, glitching hazards, and synthesis warnings.
Problem Statement & Requirements
Track which of two cache ways was least recently used with a single bit — the tiny piece of state behind LRU replacement in a 2-way set-associative cache.
Hardware design teams at leading semiconductor firms evaluate these exact port contracts, race-condition assertions, and corner cases during technical design reviews and ASIC engineer interviews.
if(access) lru_way <= ~way;. Flipping that to lru_way <= way points the tracker at the way that was just used instead of the one that wasn't — a real cache using this bit to pick an eviction victim would then evict the entry it just touched, defeating the entire purpose of LRU.Port List & Interface Timing
The hidden testbench instantiates top_module. Module port names and bit-widths must match the interface contract exactly:
| Name | Dir | Width | Description |
|---|---|---|---|
| clk | input | 1 | Clock |
| rst | input | 1 | Sync active-high reset (lru_way=0) |
| access | input | 1 | 1 when a cache access happens this cycle |
| way | input | 1 | Which way (0 or 1) was accessed |
| lru_way | output | 1 | The way that should be evicted next (least recently used) |
Timing Constraints & Synthesizable RTL Rules
Timing Contract: Strict synchronous timing aligned to posedge clk or zero-delay combinational propagation.
Synthesis Constraints: Synthesizable Verilog-2001. No # delays in synthesizable RTL.
Starter RTL Code
module top_module(
input clk,
input rst,
input access,
input way,
output reg lru_way
);
// Your code here — on access, the OTHER way becomes the LRU candidate.
endmodule
Related RTL Problems in Level 8
- Watchdog Timer — A timeout that fires unless it keeps getting "kicked" — the safety-net circuit that resets a hung system when its heartbeat stops arriving.
- Fixed-Priority Arbiter — Grant exactly one of four requesters at a time, always favoring the highest-index request when several arrive together.
- CRC-4 Generator — Compute the 4-bit CRC remainder of an 8-bit message using the CRC-4 (poly x⁴+x+1) bit-serial algorithm, entirely in combinational logic.
Connected EcrioniX Learning Resources
Accelerate your VLSI engineering knowledge with these curated learning materials:
Progress through step-by-step verified modules from fundamentals to advanced silicon design.
Benchmark your hardware knowledge across 10 semiconductor domains and receive study roadmaps.
Explore foundational circuit theory, waveform timing, and physical hardware implementation.
Frequently Asked Questions
What does 2-Way LRU Tracker require?
Track which of two cache ways was least recently used with a single bit — the tiny piece of state behind LRU replacement in a 2-way set-associative cache. Implement it as Verilog module top_module matching the listed ports.
Is this design combinational or sequential?
Tags: sequential, cache. If a clock signal is present in the port table, implement it as sequential logic; otherwise, use continuous assignments or combinational blocks.
How is my solution graded?
A hidden SystemVerilog testbench simulates your module in the cloud judge. You pass when all directed corner cases match the golden model and the VCD timing waveform matches the contract.
How does this challenge help with semiconductor interviews?
Technical interviewers at NVIDIA, Qualcomm, Apple, and Intel routinely ask candidates to code, debug, and explain the timing waveforms of 2-Way LRU Tracker to assess real-world synthesizability and race-condition awareness.